ISRO working on Chandrayaan and Aditya

[ad_1]

Chandrayaan: Scientists of Indian Space Agency (ISRO) are working on two important missions these days. The first mission is the launch of Chandrayaan-3, while the second mission is the preparation of Aditya L-1, a vehicle to be sent to the Sun. It is believed that both the missions will be successfully completed by August this year.

According to the information given by the scientists, the launch window of Chandrayaan-3 will start from July 12. Similarly, the launch window for Aditya L-1 will be available till August 12. However, if Aditya Mission is not sent this time, it will be sent next year.

On the occasion of International Conference on Spacecraft Mission Operations, ISRO Chairman S. Somnath said that the integration work of Chandrayaan-3 and LVM-3 will be started soon at the Satish Dhawan Space Center in Sriharikota. Currently, the spacecraft and the lander’s propulsion module are being tested along with the rover. After completing the necessary preparations, the work of integration will be started by combining them.

According to the information given by ISRO, the same route has been chosen for the launch of Chandrayaan-3 which was adopted for Chandrayaan-2. A landing site has also been selected at the same location, although this time the orbiter is not being sent. It may be mentioned that the Chandrayaan-2 mission crashed during landing.

note: You can download our app to read breaking news in Punjabi. You can also follow Pro Punjab TV on social media platforms Facebook, Twitter and Instagram.

TV, FACEBOOK, YOUTUBE from First every the news to read for Download do PRO PUNJAB TV APP

APP Download to do for Link ‘on Click do:

Android: https://bit.ly/3VMis0h

iOS: https://apple.co/3F63oER

[ad_2]

Source link